Consumption and tariff review
Review bills, opening hours, weekend demand and major loads. Interval data, where available, helps compare production with actual daytime demand.
Plan solar around the hours your business actually uses electricity.
Commercial solar can serve offices, shops, schools, warehouses and other business premises in Pakistan. Resicon Energy reviews operating schedules, consumption and property constraints before proposing an installation. The business case should compare project costs with realistic generation and on-site use. Include holidays, seasonal demand, maintenance and electricity still purchased from the grid.
Explore your solar potential
Review bills, opening hours, weekend demand and major loads. Interval data, where available, helps compare production with actual daytime demand.
Separate generation, direct use and export estimates. Include maintenance, possible replacement costs and financing; payback needs a clear calculation.
Consider roof condition, landlord consent, loading limits, drainage and access. Fit the array around rooftop equipment and operational needs.
Agree access, working areas and shutdowns. Schools, clinics and trading businesses can need different work windows and backup arrangements.
Compare generation over time. Consumption or export reporting may need extra meters; specify which measurements will be available.
Set cleaning, inspection and fault-reporting arrangements. Record plans for new machinery or floor space so expansion can be assessed.
Clear steps, from the first conversation to a working system.
Share bills, hours, ownership details and critical loads that cannot tolerate interruption.
Review infrastructure and compare generation with demand on working days, weekends and closures.
Review equipment, costs and permissions. Confirm structural-check and connection-upgrade responsibilities.
Set access and isolation windows with the premises manager. Record scope changes.
Complete checks, provide operating information and establish performance-review data.
Compare complete cost with estimated annual net savings. State tariff, self-consumption, export, operating cost and replacement assumptions. Request a lower-generation scenario too. No single payback period applies to every business.
It may, but account for reduced demand during closure. Sizing only around busy weekdays can leave more generation unused or exported under different terms. Share your weekly and seasonal schedule.
Panel model and layout determine area. Divide target DC capacity by panel wattage to estimate count, then allow for actual dimensions, tilt, spacing, access and obstacles. A fixed area without a surveyed layout is not a dependable purchase basis.
Possibly, subject to roof space, inverter limits, electrical capacity and revised approval requirements. Keep ratings and layout records. New panels are not automatically compatible with the existing inverter or grid agreement.
Do not assume a loan, subsidy, exemption or instalment plan. Confirm availability and terms with the relevant provider in writing. Have your accountant review the applicable treatment for the business and purchase.
Only a backup-capable design can supply agreed circuits without the grid. Identify essential IT, refrigeration and other loads separately. Verify transfer behaviour and runtime before relying on it for critical operations.
Get a free initial conversation about your electricity use, system options and site survey. Share a few details and our team will follow up.
No bill document is required here. Our team can arrange a secure way to review it with you.
Start with a conversation. We’ll help you understand your space, your energy needs, and your next step.
Or call +92 300 0403826